Saturday, May 25, 2019

Liverpool one shopping development Essay

Liverpools CBD needed regeneration for a variety of reasons. During WW2, it was bombed heavily, due to it organism a major port for resources from the USA. During the 1960s, it was rebuilt too quickly and then fell into disrepair before 2000, when the design and infrastructure was outdated. Many parts of the city, especially the CBD suffered from urban decline, with its population move by 50% and 45% of its industry also leaving. In addition, Liverpool faced competition for shopping by nearby Manchester and Chester, as well as out-of-town shopping centres like the Trafford Centre.Therefore, Liverpools CBD needed regeneration to be more attractive to consumers, and regain its spot in the top 5 shopping destinations in the UK. Liverpool One, the project to rejuvenate Liverpools CBD was completed in 2008. It was opened in phases on 29 May and 1 October 2008, with the final residential lots start in early 2009. In the same year, Liverpool was named as the European Capital of Culture. I ts total cost is approximately ? 1billion, with 42 acres of Liverpool city centre being redeveloped. It includes 3000 parking spaces, 169 stores or services, as well as a 5 acre park, and 500 new apartments.It also contains a 14-screen cinema and a 36-hole adventure play centre. Shops present include Debenhams, John Lewis, Ted Baker, Waterstones, Starbucks, Topshop and Caffe Nero. These atomic number 18 all mainly comparison, high-order goods which are chain stores. The area is indoor, yet also mainly open-air. It is of a modern design, and is cardinal storeys tall. There are many cafes and food areas, with many benches. There are also electronic maps and information panels across the centre. The pedestrian areas are wide and escalators are available to proceed to the higher floors.There have also been other improvements in the CBD, such as the rejuvenation of the Docks and the introduction of the Merseytram tram line in the CBD. As well as this, many roads and smaller streets in Liverpool have been rejuvenated and rebuilt as part of the redevelopments. Areas such as Princes Dock and the Kings Waterfront have seen intelligent redevelopments. These have been to attract more tourists and shoppers to the CBD. The project has overall been successful as of yet, with 83% of consumers thinking that the city centre has improved.91% of people said they were apt(predicate) to return to Liverpool, and enjoyed the experience. And now, 40% of the shops in Liverpool One are new to the city, showing the popularity of the area. The previously redeveloped Albert Dock has been receiving an extra 100000 visitors per week, with Liverpool One itself receiving over 120000 visitors in the start-off day, and 13 million in the first year. It is safe the say the rejuvenation of Liverpools CBD has been a success, and that Liverpool One has played a big part in reversing the effect of urban decline.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.